Tags

, , , , , , , , , , , , , , , , ,

the work on the pond waterfall area started in early June… when the first two fixes didn’t work we moved on to more serious attempts

the water in the upper pond was removed, and all the gunk was vacuumed out…

a group of three attempted to lift out the waterfall rock… unfortunately, it broke in the process… one of us might have had a meltdown;-(…

next the remaining blocks were removed and a new liner was installed… then the blocks were put back in… a bit of a puzzle to remember where each one went, lol… possibly they should have been numbered;-)…

the next step involved filling cracks with foam and gluing down some of the rocks…

with help from a friend the main piece of the waterfall rock was carefully lowered back into its spot…

it took three of us, but the three pieces of the waterfall rock were joined together with special rock cement and we waited a week for it to cure…

then the flat rock portion was glued down and left to cure…

next the hose was put down inside the liner and the waterfall spillway was placed back into the waterfall rock… there were a lot of crossed fingers at that point…

finally, on Sunday night, August 10th the waterfall was turned on…

it was too late for a good picture, so this one was taken the next morning…

there is no leaking 🤪…

a great job by my housemate and various friends throughout the process as issues arose and heat and rain caused stoppages…

what a treat to hear the water running and not have to worry about adding water all the time;-)…