a big project over the last week was fixing the three dresser drawers along the inside wall so that they would open…
a while ago, a pump was leaking from one of the tanks and the water ran down the front of the drawers… the other problem was the weight of the tanks on the dresser…
we started by emptying the water in two tanks and then removing them… after that the three drawers were yanked out, lol…
a 2×6 went under the corner of the dresser to raise it up a bit, and then the edges of the three drawers were cut down a little which means they will open easily in the future…
while the drawers were out, I went through them one-by-one (as well as the three next to them) and made piles for saving, giving away, and garbage… then each of the six drawers was reorganized… that was like a whole different project, lol…
then we got help to pick up a piece of plywood to go on the top of the dressers, it was cut, after which the pieces were painted and put on top of the dressers…
after all that work, the fishtanks were cleaned, and then put back (another project, lol)… in the next few days, they will be filled with water and the pumps started to clean the water before the fish come in…
at last the living and dining room have been returned to normal;-)…
a bit later my housemate discovered the cutest little frog and popped them next to the pond…
I had an enjoyable time reading outside, although I did have a blanket on as it was a bit cool, but the garden looked tidy following a cut, trim and blow, lol…
everything is so lush following all the rain…
the waterfall area has had the last of the liner cut back now that we are sure it isn’t leaking, yay…
started with breakfast at the Park Cafe… I really enjoyed the falafels…
from there it was over to the English Garden which is just gorgeous right now…
I found a lovely rose, just after we saw a hummingbird, although it moved too fast for me to get a photo…
in the Leo Mol Arbor we spotted one of the muskrats;-)…
had some fun with water lilies and frogs at the lily pond…
the gardens were being prepped for the big donor event this week… pressure washers were cleaning up the concrete, while lights were being added to the trees throughout the space… it will look lovely in the evening;-)…
my company magically touched the power box beside the pond and got it working…
we need a short extension as the pump in the pond has moved a little further away, and I will be very happy to remove the orange extension cord that has been snaking through the grass, lol…
I’d been hopeful that the photos which have been sent to my electronic frame could be copied before deleting from the frame, but it was clear that isn’t possible…
then, three rooms got new fan/light combinations to replace the thirty-year-old ones that were beginning to break down… my job was to join the blades to the connecting hardware;-)…
the thermostat, which since it was installed two years ago, hasn’t been able to run the fan continuously when the furnace was off was finally fixed, yay…
so happy to remove these items from the project list;-)…
spent some time yesterday changing the den to a bedroom;-)…
furniture was moved inside and outside of the room… a second mattress was brought down from upstairs to make the pullout couch more comfy, a quilt came up from the basement, and then the bed was made up in anticipation of company…
a basket of towels was put together, a bigger fan moved into the space, and a little rosebush was added to brighten it…
post its were added to advise the proper names to use when speaking with the household technology so that lights would go on and off as requested, lol…
the work on the pond waterfall area started in early June… when the first two fixes didn’t work we moved on to more serious attempts…
the water in the upper pond was removed, and all the gunk was vacuumed out…
a group of three attempted to lift out the waterfall rock… unfortunately, it broke in the process… one of us might have had a meltdown;-(…
next the remaining blocks were removed and a new liner was installed… then the blocks were put back in… a bit of a puzzle to remember where each one went, lol… possibly they should have been numbered;-)…
the next step involved filling cracks with foam and gluing down some of the rocks…
with help from a friend the main piece of the waterfall rock was carefully lowered back into its spot…
it took three of us, but the three pieces of the waterfall rock were joined together with special rock cement and we waited a week for it to cure…
then the flat rock portion was glued down and left to cure…
next the hose was put down inside the liner and the waterfall spillway was placed back into the waterfall rock… there were a lot of crossed fingers at that point…
finally, on Sunday night, August 10th the waterfall was turned on…
it was too late for a good picture, so this one was taken the next morning…
there is no leaking 🤪…
a great job by my housemate and various friends throughout the process as issues arose and heat and rain caused stoppages…
what a treat to hear the water running and not have to worry about adding water all the time;-)…