a big project over the last week was fixing the three dresser drawers along the inside wall so that they would open…
a while ago, a pump was leaking from one of the tanks and the water ran down the front of the drawers… the other problem was the weight of the tanks on the dresser…
we started by emptying the water in two tanks and then removing them… after that the three drawers were yanked out, lol…
a 2×6 went under the corner of the dresser to raise it up a bit, and then the edges of the three drawers were cut down a little which means they will open easily in the future…
while the drawers were out, I went through them one-by-one (as well as the three next to them) and made piles for saving, giving away, and garbage… then each of the six drawers was reorganized… that was like a whole different project, lol…
then we got help to pick up a piece of plywood to go on the top of the dressers, it was cut, after which the pieces were painted and put on top of the dressers…
after all that work, the fishtanks were cleaned, and then put back (another project, lol)… in the next few days, they will be filled with water and the pumps started to clean the water before the fish come in…
at last the living and dining room have been returned to normal;-)…
did some work on the small pond pumps, which are used to move the water in the bathtub pond and add more oxygen in the main pond…
climbed into the pond and brought the pump onto the edge of the deck and cleaned out all the gunk that was in it and then put it back into the pond…
brought up the second pump and after climbing into the bathtub pond, got it set in the correct spot so it wouldn’t send the water out of the pond… then it was turned on and that pond was topped up…
now there won’t be any issues with mosquitoes and I’m going to add a few more plants to that one…
Friday’s project was to clean out the pumps on each of the three fishtanks…
it always slips down towards the bottom of the list, but once I get going, it isn’t that difficult, and doesn’t take that long either…
usually I only do one or two, but this time I did all of them at the same time…
the pumps are now running beautifully, and I topped up the water in each one… usually I do the topping up on Mondays, but was just a bit sooner this time;-)…
yesterday I went into the pond to take out the small pump and clean it…
it was very dirty, ugh… the process of getting in and out of the pond involves a chair, towel, watershoes, and this time, a bucket to put the bits that needed to be cleaned…
then I used the hose to clean everything… dirty business, lol…
after I put the pump back, it was working better, but not as well I was hoping for…
and I cleaned out the main pump while I was in there;-)… glad that job is done…
at 5:30 Tuesday night l started to change the water in the hot tub…
a bit late to start the process, but that was how the day had gone, and it really needed to be done…
turned it off, brought up the pump, connected it to the large hose and within twenty minutes it was almost empty… it is so much quicker with the larger hose…
next I had to climb in and scoop out the last of the water and give it a good wipe down… that part always takes time, usually half an hour or so…
finally, after putting in the new filter, the water started to go in…
forty-five minutes later it was full and ready to be turned back on…
plugged back in and by Thursday morning it was ready for chemicals… it takes about five different ones, which go in one every twenty minutes or so, to get it ready for jumping in;-)…
had a nice time in the hot tub that evening, especially after all the work that had gone on over the last week…
tonight I enjoyed another visit to the tub and although it was overcast, it wasn’t raining or windy, lol… yay…