walked around and reviewed the work that needs to happen on the weekend…
soil will be delivered… all of the stepping stones are going to be lifted and soil and grass seed put in their place…
in the side garden, the wooden path will be removed and the stepping stones that were taken up in the main area will be used to replace the wooden path…
this will be a bit sad as my beloved laid all of these paths but it is time to change it up… right now many of the spots are tripping hazards as they have sunk a lot…
any leftover soil will go into the various beds and pots around the space… hoping that the two yards of soil is just the correct amount…
spent the entire day in the garden… nice to enjoy the warmth and sun…
my grandson came over and a contractor friend of his arrived to do some work on the decks… we had arranged the appointment before the newest regulations were out… I was very happy that he wore his mask the whole time he was here…
he fixed a piece of the decking beside the hot tub, which was falling apart… then he tacked up loose boards under the main deck and finally he repaired a loose piece under the gate pergola which is going to make opening the hot tub much easier…
then the two of them made sure that all the lattice along the garage was in the proper spot… it was quite a process and looks so much better now…
after lunch our contractor friend left and my grandson cleaned the pump in the pond, mowed the grass, trimmed up some cedars, and dug out a bunch of flower pots from the shed…
after he left, I moved and rearranged pots, and planted a few items which can go in and out of the garage until the weather warms up…
prepared the last five solar lights that my grandson had picked up for me…
I’ve put them all into a flower pot until the weather settles down and the ground is frost-free… at which point they can go into various areas of the garden…
the cap on one wasn’t closed and it took me a while to figure out how to fasten it… once I had it fixed, I went and found one that had seemed to have a similar problem from the first batch I received…
unfortunately, that one didn’t work, but I dug out some duct tape and got it connected…
duct tape was one of my beloved’s favourite things;-)…
well, it took most of the day, but I got the obelisk put together;-)…
started first thing in the morning… put a couple of layers together and then made a mistake and couldn’t remove a pipe that was stuck… left it and kept thinking about it… was really missing my beloved… he had the strongest hands and that was what I needed…
eventually I remembered the clamp that is attached to the workbench in the garage…
after using cloth, the clamp and pliers, I was able to separate two of the pieces… finally was able to add a piece upside down and connect the remaining pieces together…
looks great;-)… hoping for a few warmer days so I can set it into the pot on the deck… the morning glories are going to look great on it…
I’ve spent time yesterday and today shovelling ice that was right by the garage door… and I’ve got rid of it all;-)…
I’m very disappointed because water is dripping under the eavestrough all along the side of the garage… this hasn’t happened before, so I am wondering if it has to do with the roof being shingled last summer…
there is water inside which I will try to shovel/push out next time I go out… my beloved would not be happy with this… I did lean some boards against the outside wall which should help move the water away from the garage…
I will be interested to see how my arms feel tomorrow, lol… you really have to ram the shovel under the ice…
trying not to see the time at the hospital that day… keeps running through my head today…
this morning I made a donation to a program that is feeding hungry people… and to the Heart & Stroke Foundation… both will help people now and in the future… my beloved was always helping others…
ordered an A&W Teenburger for my supper in celebration of one of his favourite foods…